In Power Apps, I am trying to view the tasks in a Project-on-the-web project, but they are not displaying.
Via Apps > Project, then, under My Active Projects, clicking a Project-for-the-web (P4W) project, then clicking that project's Tasks tab, instead of the tasks loading, I get the following error message:
The tasks grid is taking a long time to load. If it does not load, please follow the steps in the documentation to address the issue. aka.ms/po-tasks-grid-setup-documentation
The instructions at the link provided are not helping; specifically, where it says to "Validate the PEX Endpoint has been correctly configured," I'm completely lost. I found nothing in Power Apps, on the web, etc. on what, exactly a PEX Endpoint is, or how to "Add the PEX Endpoint filed to the Project Parameters page."
Per the link, I have set Edge to allow popups from the specific Dataverse environment.
How can I view the Project-for-the-web tasks in Power Apps?